Skip to content
S.K. Energy Development Ltd.

S.K. Energy Development Ltd.

Menu
  • SK ENERGY Development Ltd
  • Organization
    • BOARD OF DIRECTORS
    • General Assembly
    • Share Holder’s
  • Salient Feature
  • Project’s Status
    • Completed Works
    • Work In Progress
    • Future Plan’s
    • WORK UPDATE
  • WORK SCHEDULE
  • GALLERY
  • NOTICE
  • Audit Report
  • Contact Us
  • NEWS
  • Construction Progress
    • Civil Works
    • Electro Mechanical Works
    • Hydro Mechanical Works Local
    • Hydro Mechanical Works (Spiral Pipe & Expansion Joint)
  • PRESENTATION
  • Legal Documents

Completed Works

Nepal Electricity Authority (NEA) and SK Energy Pvt. Ltd. have signed a power purchase agreement for the Shyamkhola Hydropower Project (7.2 MW).

Detailed engineering design, drawing & report Completed.

Transmission line survey report,drawing and bid document is completed.

Bidding document for EM/HM/Civil Completed.

PPA approved from electricity Regulatory commision Collateral.

Performance Guarantee & Documents for PPA is completed.

Desk Study Report.

Survey License Obtained.

Feasibility Status Report (FSR).

Energy lock with (NEA).

IEE TOR Submitted to (DOED).

Grid connection Aggrement on 2078/09/20.

Land Purchase 99% complete.

Transmission Line Desk Study Report Done.

Transmission Line Survey License obtained.

IIE TOR Approved by DOED.

(NEW) Survey Licence Renewed.

Electromechanical MS FLAT Earthing below ground level materials successfully dispatched at site.

Upfront equity raised for term loan disbursement

Access road has been maintained and improved.

Excavation works of peaking reservoir has been 52.65% completed.

Excavation works of peaking reservoir has been 100% completed

Hydro Mechanical Local works Pathibhara Construction Works Contractor Awarded.

Hydro Mechanical Local works Pathibhara Construction Works Contractor dispatched the Rolling Machine Steel gates Stop Log and other material dispatched at the project site and Saddle plate has been manufactured at site and installing the materials.

Hydro Mechanical Pipe Fabrication and Expansion Joints Contract Awarded to HH Steel.

Hydro Mechanical Pipe Fabrication and Expansion Joints HHSteel Succesfully finished the production of pipes and joints and the material.

S.K ENERGY DEVELOPMENT PVT. Ltd is now S.K ENERGY DEVELOPMENT Ltd

SK ENERGY DEVELOPMENT NEWS!!

  • SK ENERGY DEVELOPMENT PVT LTD NEWS!!
    NOTICE OF INVITATION FOR BIDS
    First Date of Publications : 01/08/2079
    1. SK Energy Development Pvt. Ltd. Kathmandu Invites bid
    from eligible bidders for the following works.
    SN Contract No. Name of Contract
    1. SKHPHMW-02-079/080 Construction of Hydro-Mechanical works of Shyam Khola HPP (7.2MW) BHojpur Nepal.
    2. SKHPHEMW-03-079/080 Construction of Electro-Mechanical works of Shyam Khola HPP (7.2MW) BHojpur Nepal.

    Deadline for Submission of bid is 01/02/2080 17:00PM
    2. Eligible Bidders may obtain further information and inspect the bidding document at Company Registered Address.
    3. If the last date of submission falls the government holiday, then the next working day shall be considered as the last date of submission.
    4. Bidders have to submit their bid (Technical and Financial) in the Company Registered Address.
    5. The company reserves right to accept or reject any or all bids without assigning whatsoever.
    (End of Section)

Our Visitor

0 1 0 6 2 7
Users Today : 9
Users Last 7 days : 95
Users Last 30 days : 373
Users This Month : 9
Users This Year : 1358
Total Users : 10627
Views Yesterday : 174
Views Last 7 days : 402
Total views : 34693
Powered By WPS Visitor Counter

Meta

  • Register
  • Log in
  • Entries feed
  • Comments feed
  • WordPress.org

S.K. Energy Development Ltd. 2026 .